<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"><channel><title>Tender Leads Daily</title><link>https://tenderleadsdaily.com/</link><description>Daily construction tenders and contract awards</description><item><title>New construction of Velika Nedelja primary school (JN007706/2026-EUe16/01)</title><link>https://tenderleadsdaily.com/o/new-construction-of-velika-nedelja-primary-school-jn007706-2026-eue16-n26093090.html</link><guid>https://tenderleadsdaily.com/o/new-construction-of-velika-nedelja-primary-school-jn007706-2026-eue16-n26093090.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Open EU-procedure tender for a new primary school building; general building contractors and MEP subcontractors in Slovenia/region.</description></item><item><title>Renovation of Dob toll station and maintenance base (JN007704/2026-EUe16/01)</title><link>https://tenderleadsdaily.com/o/renovation-of-dob-toll-station-and-maintenance-base-jn007704-2026-eue1-n26093089.html</link><guid>https://tenderleadsdaily.com/o/renovation-of-dob-toll-station-and-maintenance-base-jn007704-2026-eue1-n26093089.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Open EU-procedure tender by DARS for motorway toll station refurbishment; suits Slovenian/regional building and road contractors.</description></item><item><title>60 MW(AC) ISTS-connected solar PV plant – EPC + 5-yr O&amp;M (SECI/C&amp;P/OP/11/0007/26-27)</title><link>https://tenderleadsdaily.com/o/60-mw-ac-ists-connected-solar-pv-plant-epc-5-yr-o-m-seci-c-p-op-11-000-n26093067.html</link><guid>https://tenderleadsdaily.com/o/60-mw-ac-ists-connected-solar-pv-plant-epc-5-yr-o-m-seci-c-p-op-11-000-n26093067.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Domestic competitive EPC tender (EMD INR 6.436 crore, ALMM modules required); Indian solar EPC contractors should check the NIT for the bid date.</description></item><item><title>5-year O&amp;M of 2x600 MW thermal power plant (Oct 2026 – Sep 2031)</title><link>https://tenderleadsdaily.com/o/5-year-o-m-of-2x600-mw-thermal-power-plant-oct-2026-sep-2031-n26093064.html</link><guid>https://tenderleadsdaily.com/o/5-year-o-m-of-2x600-mw-thermal-power-plant-oct-2026-sep-2031-n26093064.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Long-term O&amp;M of a 1,200 MW coal plant starting 1 Oct 2026; manpower, scaffolding, NDT, insulation and spares suppliers should approach Power Mech.</description></item><item><title>500 MW(AC)/550 MWp solar PV plant at Dantoor, Khajuwala – turnkey EPC incl. 33 kV line and evacuation bay</title><link>https://tenderleadsdaily.com/o/500-mw-ac-550-mwp-solar-pv-plant-at-dantoor-khajuwala-turnkey-epc-incl-n26093062.html</link><guid>https://tenderleadsdaily.com/o/500-mw-ac-550-mwp-solar-pv-plant-at-dantoor-khajuwala-turnkey-epc-incl-n26093062.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>12-month turnkey 500 MW solar EPC in Rajasthan; module-mounting structures, inverters, HT switchgear, cabling, SCADA and piling suppliers should target KPI Green.</description></item><item><title>BP UK North Sea (West of Shetland &amp; central North Sea) engineering and integrity services frame agreement – 3+1+1 years</title><link>https://tenderleadsdaily.com/o/bp-uk-north-sea-west-of-shetland-central-north-sea-engineering-and-int-n26093050.html</link><guid>https://tenderleadsdaily.com/o/bp-uk-north-sea-west-of-shetland-central-north-sea-engineering-and-int-n26093050.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Expanded BP frame (≈50 roles) covering integrity management and project support offshore UK – inspection/NDT, coating, insulation, access and manpower suppliers should register with Aker Solutions&#x27; Life Cycle unit.</description></item><item><title>Alhada gas processing plant – expressions of interest received from contractors</title><link>https://tenderleadsdaily.com/o/alhada-gas-processing-plant-expressions-of-interest-received-from-cont-n26093038.html</link><guid>https://tenderleadsdaily.com/o/alhada-gas-processing-plant-expressions-of-interest-received-from-cont-n26093038.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Early-stage EPC interest for a new Aramco gas plant supporting the 2030 gas-growth target; process-piping, vessel, E&amp;I and heavy-lift firms should track the prequalified EPC bidders.</description></item><item><title>Oxagon freight rail (400+ km, Port of Neom – SAR North-South Railway at Al-Baseeta) – concept design, feasibility and route-alignment studies</title><link>https://tenderleadsdaily.com/o/oxagon-freight-rail-400-km-port-of-neom-sar-north-south-railway-at-al-n26093037.html</link><guid>https://tenderleadsdaily.com/o/oxagon-freight-rail-400-km-port-of-neom-sar-north-south-railway-at-al-n26093037.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Design consultancy tender for a 400 km+ freight rail link from Oxagon port to the North-South line (bids due 29 Oct 2026); rail design, survey and transport-planning consultancies should bid.</description></item><item><title>Latifa Bint Hamdan Corridor – 12 km road upgrade with 7 bridges (2.3 km) and 8 tunnels (900 m), two packages</title><link>https://tenderleadsdaily.com/o/latifa-bint-hamdan-corridor-12-km-road-upgrade-with-7-bridges-2-3-km-a-n26093030.html</link><guid>https://tenderleadsdaily.com/o/latifa-bint-hamdan-corridor-12-km-road-upgrade-with-7-bridges-2-3-km-a-n26093030.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>AED 2bn Dubai road corridor with bridges and underpasses awarded to L&amp;T (completion end-2028); earthworks, piling, precast, drainage, utilities diversion, lighting and traffic-management subcontractors should approach L&amp;T.</description></item><item><title>Prince Fawaz neighbourhood storm-water drainage – tender 260739010255</title><link>https://tenderleadsdaily.com/o/prince-fawaz-neighbourhood-storm-water-drainage-tender-260739010255-n26093012.html</link><guid>https://tenderleadsdaily.com/o/prince-fawaz-neighbourhood-storm-water-drainage-tender-260739010255-n26093012.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Drainage and utility contractors in Jeddah – closes 14 Oct.</description></item><item><title>Deep injection wells pilot – supervision consultancy (PWA/STC/27/2026)</title><link>https://tenderleadsdaily.com/o/deep-injection-wells-pilot-supervision-consultancy-pwa-stc-27-2026-n26093011.html</link><guid>https://tenderleadsdaily.com/o/deep-injection-wells-pilot-supervision-consultancy-pwa-stc-27-2026-n26093011.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Hydrogeology / drainage consultants – supervision tender, closes 4 Oct.</description></item><item><title>Community College of Qatar renovation works – consultancy (PWA/STC/15/2026)</title><link>https://tenderleadsdaily.com/o/community-college-of-qatar-renovation-works-consultancy-pwa-stc-15-202-n26093010.html</link><guid>https://tenderleadsdaily.com/o/community-college-of-qatar-renovation-works-consultancy-pwa-stc-15-202-n26093010.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Design/supervision consultants – college renovation, closes 4 Oct.</description></item><item><title>Al-Rus road protection works – tender 18/2026/DGO/DM-3</title><link>https://tenderleadsdaily.com/o/al-rus-road-protection-works-tender-18-2026-dgo-dm-3-n26093009.html</link><guid>https://tenderleadsdaily.com/o/al-rus-road-protection-works-tender-18-2026-dgo-dm-3-n26093009.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Small civil contractors – road protection works, closes 5 Oct.</description></item><item><title>Roads &amp; utility networks for the Al Dhahirah Economic Zone (IP2) – tender 15/2026/OPAZ</title><link>https://tenderleadsdaily.com/o/roads-utility-networks-for-the-al-dhahirah-economic-zone-ip2-tender-15-n26093008.html</link><guid>https://tenderleadsdaily.com/o/roads-utility-networks-for-the-al-dhahirah-economic-zone-ip2-tender-15-n26093008.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Road and utility contractors – industrial-zone infrastructure, bids close 18 Oct.</description></item><item><title>Power distribution network for electrical submersible pump (ESP) systems – RFP-2154985</title><link>https://tenderleadsdaily.com/o/power-distribution-network-for-electrical-submersible-pump-esp-systems-n26093007.html</link><guid>https://tenderleadsdaily.com/o/power-distribution-network-for-electrical-submersible-pump-esp-systems-n26093007.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Oilfield electrical contractors – KOC tender closes 27 Oct.</description></item><item><title>Al Maktoum International Airport phase 1 – underground structures scaffolding subcontract</title><link>https://tenderleadsdaily.com/o/al-maktoum-international-airport-phase-1-underground-structures-scaffo-n26093006.html</link><guid>https://tenderleadsdaily.com/o/al-maktoum-international-airport-phase-1-underground-structures-scaffo-n26093006.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Underground works at DWC are mobilised – formwork, rebar, waterproofing and equipment-hire firms should approach CHEC.</description></item><item><title>Ajdan Infinity – 40-storey residential tower main contract</title><link>https://tenderleadsdaily.com/o/ajdan-infinity-40-storey-residential-tower-main-contract-n26093005.html</link><guid>https://tenderleadsdaily.com/o/ajdan-infinity-40-storey-residential-tower-main-contract-n26093005.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>High-rise residential – façade, MEP, lifts and fit-out subcontractors for 2026–29 works.</description></item><item><title>Three BESS projects, 1,500 MW / 6,000 MWh – storage services agreements, SAR 3.25bn</title><link>https://tenderleadsdaily.com/o/three-bess-projects-1-500-mw-6-000-mwh-storage-services-agreements-sar-n26093004.html</link><guid>https://tenderleadsdaily.com/o/three-bess-projects-1-500-mw-6-000-mwh-storage-services-agreements-sar-n26093004.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Grid batteries incl. a 380 kV substation extension – civil, HV and commissioning subcontractors.</description></item><item><title>Aramco Zuluf water treatment plant phase 2 (308,000 m³/day total) – BOOT, USD 940M</title><link>https://tenderleadsdaily.com/o/aramco-zuluf-water-treatment-plant-phase-2-308-000-m-day-total-boot-us-n26093003.html</link><guid>https://tenderleadsdaily.com/o/aramco-zuluf-water-treatment-plant-phase-2-308-000-m-day-total-boot-us-n26093003.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Water treatment for oil-field injection – treatment equipment, pumps, piping and E&amp;I suppliers.</description></item><item><title>Técnicas Reunidas wins USD 7.4bn ADNOC awards – onshore gas processing + Upper Zakum EPCI packages</title><link>https://tenderleadsdaily.com/o/t-cnicas-reunidas-wins-usd-7-4bn-adnoc-awards-onshore-gas-processing-u-n26093002.html</link><guid>https://tenderleadsdaily.com/o/t-cnicas-reunidas-wins-usd-7-4bn-adnoc-awards-onshore-gas-processing-u-n26093002.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Offshore and onshore oil &amp; gas packages – fabrication yards, piping, tanks and E&amp;I subcontractors should approach TR.</description></item><item><title>Adnoc Gas Rich Gas Development phases 2 &amp; 3 – gas processing train &amp; NGL fractionation EPC, USD 8.2bn</title><link>https://tenderleadsdaily.com/o/adnoc-gas-rich-gas-development-phases-2-3-gas-processing-train-ngl-fra-n26093001.html</link><guid>https://tenderleadsdaily.com/o/adnoc-gas-rich-gas-development-phases-2-3-gas-processing-train-ngl-fra-n26093001.html</guid><pubDate>Wed, 30 Sep 2026 06:00:00 +0300</pubDate><description>Two EPC winners now subcontract piping, mechanical, E&amp;I, scaffolding and NDT packages at Habshan and Ruwais.</description></item><item><title>Level 1 multi-use water supply systems, 6 lots (Rapale, Lalaua, Angoche, Moma, Muecate, Errati), MZ-DPOPN-RSTWSP-OBRAS-P025-2022 (World Bank)</title><link>https://tenderleadsdaily.com/o/level-1-multi-use-water-supply-systems-6-lots-rapale-lalaua-angoche-mo-w26093026.html</link><guid>https://tenderleadsdaily.com/o/level-1-multi-use-water-supply-systems-6-lots-rapale-lalaua-angoche-mo-w26093026.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Six small rural water-system contracts (~USD 0.4M each, 18 months) awarded to four local firms; pipe, pump, tank and solar suppliers can target the winners.</description></item><item><title>Supply of accessories for 50,900 electricity service connections, 026-AO/2026/DECIM (World Bank)</title><link>https://tenderleadsdaily.com/o/supply-of-accessories-for-50-900-electricity-service-connections-026-a-w26093025.html</link><guid>https://tenderleadsdaily.com/o/supply-of-accessories-for-50-900-electricity-service-connections-026-a-w26093025.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Single-lot supply tender for electricity connection accessories (5-month delivery); for cable, meter-box and distribution-hardware suppliers.</description></item><item><title>Refurbishment of Huduma Centres in borderland areas (Amagoro, Holili, Moyale), 3 lots, KE-ICTA-571738-CW-RFB (World Bank)</title><link>https://tenderleadsdaily.com/o/refurbishment-of-huduma-centres-in-borderland-areas-amagoro-holili-moy-w26093024.html</link><guid>https://tenderleadsdaily.com/o/refurbishment-of-huduma-centres-in-borderland-areas-amagoro-holili-moy-w26093024.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Open RFB for three building-refurbishment lots at Kenyan border posts; suits Kenyan general building and fit-out contractors (KES 2.5M bid security per lot).</description></item><item><title>Drinking-water supply reinforcement for Niakara, Kanawolo &amp; surrounding localities, CI-ONEP-461291-CW-RFB (World Bank)</title><link>https://tenderleadsdaily.com/o/drinking-water-supply-reinforcement-for-niakara-kanawolo-surrounding-l-w26093023.html</link><guid>https://tenderleadsdaily.com/o/drinking-water-supply-reinforcement-for-niakara-kanawolo-surrounding-l-w26093023.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>CHEC won an 18-month water supply contract (~USD 21M) in northern Côte d&#x27;Ivoire; pipe, pump, treatment-equipment and local civil subcontractors should approach CHEC.</description></item><item><title>Rehabilitation of shelters (public schools) – batch 2, lots 1–3 (Minyeh, Tripoli, Mount Lebanon) (World Bank)</title><link>https://tenderleadsdaily.com/o/rehabilitation-of-shelters-public-schools-batch-2-lots-1-3-minyeh-trip-w26093015.html</link><guid>https://tenderleadsdaily.com/o/rehabilitation-of-shelters-public-schools-batch-2-lots-1-3-minyeh-trip-w26093015.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Light repair of school buildings used as shelters (lighting, plumbing, painting, tiling) procured by CDR; suits Lebanese finishing and MEP contractors, short bid window.</description></item><item><title>Rehabilitation &amp; upgrading of BAU, IP delegation building in Pemba (Cabo Delgado), MZ-MEF-DNT-485396-CW-RFB (World Bank)</title><link>https://tenderleadsdaily.com/o/rehabilitation-upgrading-of-bau-ip-delegation-building-in-pemba-cabo-d-w26093014.html</link><guid>https://tenderleadsdaily.com/o/rehabilitation-upgrading-of-bau-ip-delegation-building-in-pemba-cabo-d-w26093014.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Six-month public building refurbishment in Pemba; suited to local building and fit-out contractors.</description></item><item><title>Southern corridor roads RN5/RN19 (23.2 km) &amp; RN1 (32 km) – rehabilitation, improvement &amp; 10-year maintenance, 2 lots, DJ-ADR-478543-CW-RFB (World Bank)</title><link>https://tenderleadsdaily.com/o/southern-corridor-roads-rn5-rn19-23-2-km-rn1-32-km-rehabilitation-impr-w26093013.html</link><guid>https://tenderleadsdaily.com/o/southern-corridor-roads-rn5-rn19-23-2-km-rn1-32-km-rehabilitation-impr-w26093013.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Output-and-performance road contract (works plus 10-year maintenance) on the Djibouti southern corridor; attractive for regional road contractors and asphalt/aggregate suppliers.</description></item><item><title>Antsakoamileka irrigated perimeter (740 ha) – intake &amp; irrigation network modernization works, 2 lots, T 05-26/CN (World Bank)</title><link>https://tenderleadsdaily.com/o/antsakoamileka-irrigated-perimeter-740-ha-intake-irrigation-network-mo-w26093012.html</link><guid>https://tenderleadsdaily.com/o/antsakoamileka-irrigated-perimeter-740-ha-intake-irrigation-network-mo-w26093012.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Hydro-agricultural civil works (intake structure and canal network) in Boeny region; suits local civil contractors and concrete/earthworks subcontractors.</description></item><item><title>Modern Syntex polyester chips plant expansion (107 to 407 TPD), ADB USD 50M loan signed</title><link>https://tenderleadsdaily.com/o/modern-syntex-polyester-chips-plant-expansion-107-to-407-tpd-adb-usd-5-n26093099.html</link><guid>https://tenderleadsdaily.com/o/modern-syntex-polyester-chips-plant-expansion-107-to-407-tpd-adb-usd-5-n26093099.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Financed capacity expansion of a PET chip plant with energy-efficient machinery and LEED Platinum target – process equipment and industrial building suppliers should contact the owner early.</description></item><item><title>Design review, detailed engineering design, tender documents &amp; works supervision for hybrid wastewater management system – consultancy EOI, CRSISP (AfDB)</title><link>https://tenderleadsdaily.com/o/design-review-detailed-engineering-design-tender-documents-works-super-n26093094.html</link><guid>https://tenderleadsdaily.com/o/design-review-detailed-engineering-design-tender-documents-works-super-n26093094.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Design-and-supervision consultancy for Juba&#x27;s wastewater system; a lead for sanitation engineering firms and a signal of a later works tender.</description></item><item><title>Detailed engineering design &amp; bidding documents for nature-based flood adaptation works (dykes, gabions, 4 bridges, rainwater harvesting) – consultancy EOI, P-RW-E00-015 (AfDB)</title><link>https://tenderleadsdaily.com/o/detailed-engineering-design-bidding-documents-for-nature-based-flood-a-n26093093.html</link><guid>https://tenderleadsdaily.com/o/detailed-engineering-design-bidding-documents-for-nature-based-flood-a-n26093093.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Six-month design consultancy for flood-protection works and four bridges in western Rwanda; suits hydraulic/civil design firms.</description></item><item><title>CA18487 – North Lindsey College Global House reclad and refurbishment (ITT)</title><link>https://tenderleadsdaily.com/o/ca18487-north-lindsey-college-global-house-reclad-and-refurbishment-it-n26093091.html</link><guid>https://tenderleadsdaily.com/o/ca18487-north-lindsey-college-global-house-reclad-and-refurbishment-it-n26093091.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>College building recladding and refurbishment ITT; cladding/façade contractors and refurbishment main contractors in the Humber region.</description></item><item><title>Pristina–Mitrovica road expansion phase 2 – additional EUR 12.3M Saudi Fund for Development loan agreed</title><link>https://tenderleadsdaily.com/o/pristina-mitrovica-road-expansion-phase-2-additional-eur-12-3m-saudi-f-n26093087.html</link><guid>https://tenderleadsdaily.com/o/pristina-mitrovica-road-expansion-phase-2-additional-eur-12-3m-saudi-f-n26093087.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>New SFD financing for the second phase of the Pristina–Mitrovica road; road and earthworks contractors should expect follow-on works procurement.</description></item><item><title>Novi Sad solid waste management project – procurement of goods, works &amp; consultancy to be launched (EBRD)</title><link>https://tenderleadsdaily.com/o/novi-sad-solid-waste-management-project-procurement-of-goods-works-con-n26093086.html</link><guid>https://tenderleadsdaily.com/o/novi-sad-solid-waste-management-project-procurement-of-goods-works-con-n26093086.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>EBRD-backed EUR 33.5M waste programme about to go to tender; relevant to landfill/civil contractors, waste-plant equipment suppliers and supervision consultants.</description></item><item><title>Revitalisation of state-owned hydropower plants – phase 3 launched (EBRD considering EUR 36M loan)</title><link>https://tenderleadsdaily.com/o/revitalisation-of-state-owned-hydropower-plants-phase-3-launched-ebrd-n26093085.html</link><guid>https://tenderleadsdaily.com/o/revitalisation-of-state-owned-hydropower-plants-phase-3-launched-ebrd-n26093085.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>EUR 46M third phase of hydro plant rehabilitation; turbine/generator refurbishers, E&amp;I and SCADA contractors should watch for tenders.</description></item><item><title>Relocation of high-voltage power lines interfering with Corridor VIII and national road corridors (ALL 1.3bn)</title><link>https://tenderleadsdaily.com/o/relocation-of-high-voltage-power-lines-interfering-with-corridor-viii-n26093084.html</link><guid>https://tenderleadsdaily.com/o/relocation-of-high-voltage-power-lines-interfering-with-corridor-viii-n26093084.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Open tender for HV line diversions clearing Albanian road corridors; fits transmission-line contractors and tower/conductor suppliers.</description></item><item><title>MaresConnect 750 MW HVDC interconnector (Ireland–Wales) – CRU approves cap-and-floor regime, moves to Final Project Assessment</title><link>https://tenderleadsdaily.com/o/maresconnect-750-mw-hvdc-interconnector-ireland-wales-cru-approves-cap-n26093083.html</link><guid>https://tenderleadsdaily.com/o/maresconnect-750-mw-hvdc-interconnector-ireland-wales-cru-approves-cap-n26093083.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Regulatory green light for a 750 MW subsea HVDC link; converter-station EPCs, HVDC cable makers and marine installers should track upcoming procurement.</description></item><item><title>Highway 11/17 twinning – McGuire Rd to Coughlin Rd (5 km, two new Black Sturgeon River bridges)</title><link>https://tenderleadsdaily.com/o/highway-11-17-twinning-mcguire-rd-to-coughlin-rd-5-km-two-new-black-st-n26093081.html</link><guid>https://tenderleadsdaily.com/o/highway-11-17-twinning-mcguire-rd-to-coughlin-rd-5-km-two-new-black-st-n26093081.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Next section of the Trans-Canada twinning with two river bridges; Ontario heavy-civil and bridge contractors should watch MTO tender calls.</description></item><item><title>Mesabi Metallics DRI/EAF steel mill – 7.5–10 Mtpa (USD 15bn), construction team not yet selected</title><link>https://tenderleadsdaily.com/o/mesabi-metallics-dri-eaf-steel-mill-7-5-10-mtpa-usd-15bn-construction-n26093080.html</link><guid>https://tenderleadsdaily.com/o/mesabi-metallics-dri-eaf-steel-mill-7-5-10-mtpa-usd-15bn-construction-n26093080.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>USD 15bn greenfield steel mill with no EPC named; industrial EPCs, steel erectors and E&amp;I firms should engage Mesabi Metallics early.</description></item><item><title>Colovore DFW02 liquid-cooled data center – 156,500 sq ft, 14700 Heritage Parkway (construction Dec 2026–Dec 2028)</title><link>https://tenderleadsdaily.com/o/colovore-dfw02-liquid-cooled-data-center-156-500-sq-ft-14700-heritage-n26093079.html</link><guid>https://tenderleadsdaily.com/o/colovore-dfw02-liquid-cooled-data-center-156-500-sq-ft-14700-heritage-n26093079.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>USD 430M single-storey data center filed with a Dec 2026 start; GC, liquid-cooling and electrical subs should pursue before contractor is named.</description></item><item><title>Lambda AI data center – MidAmerica Industrial Park, Mayes County (site prep by Cloverleaf Infrastructure)</title><link>https://tenderleadsdaily.com/o/lambda-ai-data-center-midamerica-industrial-park-mayes-county-site-pre-n26093078.html</link><guid>https://tenderleadsdaily.com/o/lambda-ai-data-center-midamerica-industrial-park-mayes-county-site-pre-n26093078.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Early-stage AI data center near Google&#x27;s MidAmerica campus; electrical, liquid-cooling and substation contractors should approach Lambda ahead of GC selection.</description></item><item><title>Coastal GasLink Phase 2 – new compressor stations and upgrades on 670 km pipeline to near-double capacity</title><link>https://tenderleadsdaily.com/o/coastal-gaslink-phase-2-new-compressor-stations-and-upgrades-on-670-km-n26093077.html</link><guid>https://tenderleadsdaily.com/o/coastal-gaslink-phase-2-new-compressor-stations-and-upgrades-on-670-km-n26093077.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>TC Energy is proceeding with compressor-station expansion after LNG Canada Phase 2 FID; compression, piping and E&amp;I contractors in BC should position for EPC packages.</description></item><item><title>Rankin Inlet Airport – rehabilitation of Runway 13-31, Taxiways A &amp; C and apron (~141,000 m² pavement), CAD 85.5M funded</title><link>https://tenderleadsdaily.com/o/rankin-inlet-airport-rehabilitation-of-runway-13-31-taxiways-a-c-and-a-n26093076.html</link><guid>https://tenderleadsdaily.com/o/rankin-inlet-airport-rehabilitation-of-runway-13-31-taxiways-a-c-and-a-n26093076.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Newly funded Arctic airfield pavement rehab; northern civil contractors, asphalt/aggregate suppliers and sealift logistics firms should track the upcoming tender.</description></item><item><title>Calgary–Red Deer–Edmonton high-speed rail – RFP to private proponents (launch fall 2026, selection April 2027)</title><link>https://tenderleadsdaily.com/o/calgary-red-deer-edmonton-high-speed-rail-rfp-to-private-proponents-la-n26093075.html</link><guid>https://tenderleadsdaily.com/o/calgary-red-deer-edmonton-high-speed-rail-rfp-to-private-proponents-la-n26093075.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Rail developer/EPC consortia should prepare for the fall-2026 RFP for a privately led Calgary–Edmonton high-speed line; design and PMC firms can join bidding teams now.</description></item><item><title>Giant Magellan Telescope – general contractor for 22-storey rotating telescope enclosure (industry meeting Nov 2026, RFQ early 2027)</title><link>https://tenderleadsdaily.com/o/giant-magellan-telescope-general-contractor-for-22-storey-rotating-tel-n26093073.html</link><guid>https://tenderleadsdaily.com/o/giant-magellan-telescope-general-contractor-for-22-storey-rotating-tel-n26093073.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Specialist remote-site GC and steel/mechanical partners should register for the Nov 3–4 industry meeting ahead of the early-2027 RFQ for the GMT enclosure.</description></item><item><title>Mobile River Bridge &amp; Bayway – Phase 1 design-build (2.5-mile cable-stayed bridge + bayway reconstruction), notice to proceed</title><link>https://tenderleadsdaily.com/o/mobile-river-bridge-bayway-phase-1-design-build-2-5-mile-cable-stayed-n26093072.html</link><guid>https://tenderleadsdaily.com/o/mobile-river-bridge-bayway-phase-1-design-build-2-5-mile-cable-stayed-n26093072.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>USD 3.2bn cable-stayed bridge now under NTP (groundbreaking 2 Oct); piling, precast, rebar, steel, marine and paving subcontractors should approach the Kiewit-Massman-Traylor JV.</description></item><item><title>Greater Port Vila urban resilience – three multipurpose emergency shelters (Agathis, Freshwind, Nambatri) + nature-based coastal protection</title><link>https://tenderleadsdaily.com/o/greater-port-vila-urban-resilience-three-multipurpose-emergency-shelte-n26093071.html</link><guid>https://tenderleadsdaily.com/o/greater-port-vila-urban-resilience-three-multipurpose-emergency-shelte-n26093071.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>ADB grant (USD 12.6M + GCF 5.6M + in-kind 0.7M) approved; design consultants and Pacific building contractors should watch for ADB procurement notices.</description></item><item><title>Advanced data-storage manufacturing facility expansion, Sama Jaya Free Industrial Zone – engineering &amp; early infrastructure works (D&amp;B)</title><link>https://tenderleadsdaily.com/o/advanced-data-storage-manufacturing-facility-expansion-sama-jaya-free-n26093065.html</link><guid>https://tenderleadsdaily.com/o/advanced-data-storage-manufacturing-facility-expansion-sama-jaya-free-n26093065.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Design-and-build works for a high-tech manufacturing expansion in Kuching, completion Aug 2027; process piping, HVAC and civil subcontractors should approach Kelington.</description></item><item><title>Multi Village drinking water supply scheme on Yeleru Reservoir – Anakapalli segment</title><link>https://tenderleadsdaily.com/o/multi-village-drinking-water-supply-scheme-on-yeleru-reservoir-anakapa-n26093063.html</link><guid>https://tenderleadsdaily.com/o/multi-village-drinking-water-supply-scheme-on-yeleru-reservoir-anakapa-n26093063.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>24-month rural water supply scheme in Andhra Pradesh; pipe, valve, pump and treatment-equipment suppliers and pipeline subcontractors should approach NCC.</description></item><item><title>Modernisation of four eastern ports (Onne, Rivers, Delta, Calabar) approved to diversify cargo from Lagos</title><link>https://tenderleadsdaily.com/o/modernisation-of-four-eastern-ports-onne-rivers-delta-calabar-approved-n26093060.html</link><guid>https://tenderleadsdaily.com/o/modernisation-of-four-eastern-ports-onne-rivers-delta-calabar-approved-n26093060.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Nigeria approved upgrades of Onne, Rivers, Delta and Calabar ports with investment details still to come – marine contractors, quay rehabilitation specialists and port consultants should track procurement.</description></item><item><title>SANRAL 241 routine road maintenance tenders (132 contractor, 109 consultant) worth ZAR 9.5bn – route-by-route tendering continuing, Nov-30 target to be missed</title><link>https://tenderleadsdaily.com/o/sanral-241-routine-road-maintenance-tenders-132-contractor-109-consult-n26093059.html</link><guid>https://tenderleadsdaily.com/o/sanral-241-routine-road-maintenance-tenders-132-contractor-109-consult-n26093059.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>SANRAL is still issuing 241 route-by-route routine road maintenance tenders (ZAR 9.5bn) after earlier panels were set aside – road maintenance contractors and consulting engineers should watch the SANRAL portal for remaining packages.</description></item><item><title>Voi–Tanzania border standard-gauge railway link – new SGR extension announced (initial KES 5bn)</title><link>https://tenderleadsdaily.com/o/voi-tanzania-border-standard-gauge-railway-link-new-sgr-extension-anno-n26093057.html</link><guid>https://tenderleadsdaily.com/o/voi-tanzania-border-standard-gauge-railway-link-new-sgr-extension-anno-n26093057.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Kenya announced a new SGR link from Voi to the Tanzanian border, at an early stage pending route and financing coordination – rail designers and civil contractors should monitor for feasibility and design tenders.</description></item><item><title>One Victoria, Manchester – completion of 129-home, 14-storey apartment scheme after Torsion administration</title><link>https://tenderleadsdaily.com/o/one-victoria-manchester-completion-of-129-home-14-storey-apartment-sch-n26093051.html</link><guid>https://tenderleadsdaily.com/o/one-victoria-manchester-completion-of-129-home-14-storey-apartment-sch-n26093051.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Replacement contractor AC1 must finish communal/external areas, snagging, testing and commissioning by December 2026 (scheme GDV ~GBP 39M) – finishing, landscaping and commissioning trades should contact AC1 quickly.</description></item><item><title>Port of Gdynia Basin II infill/reclamation, stage 1 (quay relocation 168 m, ~3 ha land, roads &amp; utilities) – 6 bids opened, PORR lowest</title><link>https://tenderleadsdaily.com/o/port-of-gdynia-basin-ii-infill-reclamation-stage-1-quay-relocation-168-n26093049.html</link><guid>https://tenderleadsdaily.com/o/port-of-gdynia-basin-ii-infill-reclamation-stage-1-quay-relocation-168-n26093049.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Bids: PORR PLN 54.0M, Budimex 71.1M, Strabag 73.7M, Doraco 76.9M, Fabe/PMEC 94.3M, NDI/Intercor 94.5M vs PLN 113.2M budget; award imminent – marine piling, sheet-pile, fill and road subcontractors should approach PORR.</description></item><item><title>CPK Warsaw–Łódź high-speed line, Airport Junction–Bolimów Junction 14.3 km civil structures section – 5 bidders shortlisted</title><link>https://tenderleadsdaily.com/o/cpk-warsaw-d-high-speed-line-airport-junction-bolim-w-junction-14-3-km-n26093045.html</link><guid>https://tenderleadsdaily.com/o/cpk-warsaw-d-high-speed-line-airport-junction-bolim-w-junction-14-3-km-n26093045.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Shortlist of Strabag/TYM-BUD, Torpol/Mirbud/Kobylarnia, Budimex, Porr/Trakcja and Intercor/NDI for bridges, viaducts, culverts, wildlife crossings and ~30 km of roads; contract due Q4 2026 – piling, precast, formwork and earthworks subcontractors should approach all five bidders now.</description></item><item><title>Safaga 220/66/22/11 kV substation expansion – 66 kV AIS turnkey (excl. main transformers), lowest bidder</title><link>https://tenderleadsdaily.com/o/safaga-220-66-22-11-kv-substation-expansion-66-kv-ais-turnkey-excl-mai-n26093044.html</link><guid>https://tenderleadsdaily.com/o/safaga-220-66-22-11-kv-substation-expansion-66-kv-ais-turnkey-excl-mai-n26093044.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Korra–Hidelco lowest at EGP 1.1bn (vs MEGA, EGEMAC) for a turnkey Safaga substation extension; switchgear, protection, cabling and civil subcontractors should approach the alliance.</description></item><item><title>Origami residential project, Taj City – construction contracts</title><link>https://tenderleadsdaily.com/o/origami-residential-project-taj-city-construction-contracts-n26093043.html</link><guid>https://tenderleadsdaily.com/o/origami-residential-project-taj-city-construction-contracts-n26093043.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>Madinet Misr awarded EGP 1.38bn of building works in Taj City (targets EGP 18bn of awards in 2026); materials and finishing suppliers should track the appointed contractors and upcoming packages.</description></item><item><title>Madinat Al Ward Phase 1 – construction works contract (after POWERCHINA earthworks)</title><link>https://tenderleadsdaily.com/o/madinat-al-ward-phase-1-construction-works-contract-after-powerchina-e-n26093042.html</link><guid>https://tenderleadsdaily.com/o/madinat-al-ward-phase-1-construction-works-contract-after-powerchina-e-n26093042.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>ORA (Naguib Sawiris) signed Dorra for phase-one buildings of its Iraqi integrated community; concrete, steel, MEP and finishing suppliers should approach CRC Dorra.</description></item><item><title>Wadi Yam DP03 East package – 660+ villas/townhouses, mall, services, lakes, roads (323,000 m² BUA, 21 months)</title><link>https://tenderleadsdaily.com/o/wadi-yam-dp03-east-package-660-villas-townhouses-mall-services-lakes-r-n26093041.html</link><guid>https://tenderleadsdaily.com/o/wadi-yam-dp03-east-package-660-villas-townhouses-mall-services-lakes-r-n26093041.html</guid><pubDate>Tue, 29 Sep 2026 06:00:00 +0300</pubDate><description>EGP 12bn+ North Coast villa and amenities package (21 months); blockwork, finishing, landscaping, lakes and MEP subcontractors should approach the Innovo–Redcon alliance.</description></item></channel></rss>
