170 MW / 340 MWh battery energy storage systems + transmission connections (design & build) – two bids received
تأهيل مسبق – Kosovo
US MCC-funded 340 MWh BESS at two Kosovo sites is in bid evaluation with construction from 2027; grid, transformer and civil subcontractors should contact both bidders.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Kosovo · Ferizaj (Sojeva) & Istog |
| Client / owner | Millennium Challenge Account Kosovo (MCC Kosovo Compact) |
| Announced | 01 Oct 2026 |
| Project type | Substations & transmission grids, Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- BMS, controls & SCADA
- Electrical & instrumentation (E&I) installation
What to do
Early stage – get on the client's or bidders' vendor lists now.