2.5M sq ft logistics and fulfilment hub – Gargash Prime / JINGDONG Property JV MoU
مركز لوجستي وتوزيع بمساحة 2.5 مليون قدم مربع في دبي – مذكرة تفاهم لمشروع مشترك بين غرغاش برايم وجينغدونغ العقارية
Early stage (MoU). Warehouse design-build, pre-engineered steel and fire-protection firms should get in early with the planned JV.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Dubai |
| Client / owner | Gargash Prime / JINGDONG Property (planned JV) |
| Announced | 16 Oct 2026 |
| Project type | Warehouses & logistics parks |
Trades and packages needed
- Pre-engineered & modular buildings (main package)
- Structural steel fabrication & erection (main package)
- Concrete works (in-situ)
- Roofing & sheeting
- Fire protection & fire alarm
- Electrical installation (LV)
What to do
Early stage – get on the client's or bidders' vendor lists now.