200 MW / 500 MWh battery energy storage system – EPC letter of award to Waaree RTL from a domestic IPP (completion FY2027-28)
ترسية عقد – India
Large BESS EPC win – battery container, PCS, transformer/switchgear suppliers and civil/E&I subcontractors should approach Waaree RTL.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | India |
| Client / owner | Unnamed domestic IPP |
| Awarded to | Waaree Renewable Technologies Ltd |
| Announced | 30 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Fire protection & fire alarm
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.