25-year distribution PPP with Weza Power – build/upgrade ~52,000 km of power lines, 1.2M+ connections (USD 1.4bn)
ترسية عقد – Burundi
Multi-decade grid build-out in Burundi – MV/LV line contractors, cable, transformer and meter suppliers should approach Weza Power early as financing is lined up.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Burundi |
| Client / owner | Government of Burundi |
| Awarded to | Weza Power (Anzana Electric Group / Gridworks) |
| Value | USD 1.4bn |
| Announced | 18 Oct 2026 |
| Project type | Substations & transmission grids, Pipelines & utility networks |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical installation (LV) (main package)
- Earthworks, excavation & site grading
- Equipment & crane rental
- Construction logistics, freight & customs
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.