Transmission-line EPC contractors and tower, conductor and insulator suppliers can bid for these 330 kV lines that connect the Absheron wind farm to the grid.
| Type | Open tender |
|---|---|
| Status | Open – closes 21 Dec 2026 (57 days) |
| Country | Azerbaijan · Absheron / Alat |
| Client / owner | Azerbaijan Scaling-Up Renewable Energy Project – Azerenerji |
| Announced | 21 Oct 2026 |
| Deadline | 21 Dec 2026 |
| Project type | Substations & transmission grids, Power plants & renewables |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Structural steel fabrication & erection (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
What to do
Register with the client and request the tender documents before the deadline.