380 kV transmission & substation projects (Saudi Arabia) plus 132/11 kV substations & cabling (UAE) – L&T 'mega' power transmission orders
مشاريع نقل ومحطات تحويل 380 ك.ف (السعودية) ومحطات 132/11 ك.ف وأعمال الكابلات (الإمارات) – طلبيات لارسن آند توبرو الكبرى لنقل الكهرباء
Switchgear, cable, tower and civil/E&I subcontractors should register with L&T for its new 380 kV Saudi and 132/11 kV UAE transmission packages (combined order with India rated INR 10,000–15,000 crore).
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Saudi Arabia · Multiple |
| Client / owner | Not disclosed (Saudi and UAE grid owners) |
| Awarded to | Larsen & Toubro (L&T) |
| Announced | 05 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Structural steel fabrication & erection
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.