4.5 GW wind & solar plus 500 MWh storage with cross-border transmission for export to China – ACWA / Sun Steppe Power MoU
تأهيل مسبق – Mongolia
Renewable developers' advisers, grid-interconnection engineers and early survey/permitting consultants should follow this early-stage Mongolia–China green-power export scheme.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Mongolia |
| Client / owner | Sun Steppe Power (Petro Matad / Sunsteppe Energy) with ACWA |
| Announced | 16 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Land surveying & geotechnical investigation (main package)
- MEP & process design engineering
- Project management & construction supervision
- Cables, switchgear & electrical materials
What to do
Early stage – get on the client's or bidders' vendor lists now.