5 Wing Goose Bay new electric central heating plant, control-system & utility-metering upgrades (energy performance contract), construction started
ترسية عقد – Canada
Electrical, HV substation, controls and mechanical subcontractors can approach MCW for packages on this CAD 187M DND heating-plant electrification at 5 Wing Goose Bay (completion 2030).
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Canada · Happy Valley-Goose Bay, NL |
| Client / owner | Department of National Defence (Government of Canada) |
| Awarded to | MCW Custom Energy Solutions Ltd. |
| Value | CAD 187M |
| Announced | 05 Oct 2026 |
| Project type | Defense & security facilities, Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Electrical installation (LV) (main package)
- MV/HV substations & transmission lines (main package)
- BMS, controls & SCADA (main package)
- Process piping fabrication & welding
- HVAC, pumps & mechanical equipment supply
- Concrete works (in-situ)
- Cables, switchgear & electrical materials
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.