50 MW / 100 MWh battery energy storage system – construction started (turnkey)
ترسية عقد – Romania
BESS container, transformer, cabling, civils and fire-protection suppliers can approach Parapet on this 100 MWh Romanian storage build.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Romania · Dumbrava-Deal, Neamț |
| Client / owner | Parapet & MetaWealth |
| Awarded to | Parapet |
| Announced | 09 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical installation (LV)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- BMS, controls & SCADA
- Fire protection & fire alarm
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.