500 kV New Capital – Economic Zone 2 corridor: supply & install 24-fibre OPGW (65 km) – limited tender 2026/2025/54
ممر 500 ك.ف العاصمة الجديدة – المنطقة الاقتصادية 2: توريد وتركيب كابل OPGW بسعة 24 شعيرة بطول 65 كم – مناقصة محدودة 2026/2025/54
OPGW, fittings and live-line stringing specialists should approach Pulse by Solutions for the 65 km 500 kV OPGW installation.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Egypt · New Administrative Capital |
| Client / owner | Egyptian Electricity Transmission Company (EETC) |
| Awarded to | Pulse by Solutions |
| Announced | 03 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- ELV, ICT & security systems (CCTV, access, cabling)
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.