99.99 MWac LSS5+ large-scale solar PV plant – EPCC incl. solar components, subcontract from YTL
ترسية عقد – Malaysia
Samaiden will build a ~100 MWac LSS5+ solar farm for YTL; module mounting, cabling, substation and civil subcontractors and suppliers should engage now ahead of notice to proceed.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Malaysia |
| Client / owner | Yeoh Tiong Lay Sdn Bhd (main contractor) |
| Awarded to | Samaiden Group (subsidiary) |
| Announced | 02 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- Electrical installation (LV) (main package)
- MV/HV substations & transmission lines
- Earthworks, excavation & site grading
- Cables, switchgear & electrical materials
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.