Adnoc Gas Rich Gas Development phases 2 & 3 – gas processing train & NGL fractionation EPC, USD 8.2bn
أدنوك للغاز – ترسية عقود هندسة وتوريد وإنشاء بقيمة 8.2 مليار دولار لمرحلتي تطوير الغاز الغني في حبشان والرويس
Two EPC winners now subcontract piping, mechanical, E&I, scaffolding and NDT packages at Habshan and Ruwais.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | UAE · Habshan / Ruwais |
| Client / owner | ADNOC Gas |
| Awarded to | Wison Engineering (USD 3.9bn); Tecnimont / Maire (USD 4.3bn) |
| Value | USD 8.2bn |
| Announced | 30 Sep 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Structural steel fabrication & erection
- Concrete works (in-situ)
- Scaffolding & access
- NDT, inspection & certification
- Industrial hot & cold insulation
- Heavy lifting, rigging & transport
- Manpower supply
- Pipes, valves & fittings supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.