ADNOC NEB central processing plant (CPP) upgrades at Nouf, Rumaitha and Shanayel – capacity and asset-integrity works (agreement expected)
تحديث محطات المعالجة المركزية NEB التابعة لأدنوك في نوف والرميثة وشنايل – أعمال رفع الطاقة وسلامة الأصول (اتفاق متوقع)
Piping, mechanical and E&I subcontractors and valve suppliers should approach Mannesmann Energy, which says it will sign with ADNOC for CPP upgrades at three onshore fields.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Abu Dhabi (Nouf, Rumaitha, Shanayel) |
| Client / owner | ADNOC |
| Parties | Mannesmann Energy (expected; not yet signed) |
| Announced | 04 Nov 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Pipes, valves & fittings supply
- NDT, inspection & certification
- Industrial blasting, coating & painting
- Shutdown, turnaround & plant maintenance
- Scaffolding & access
- Manpower supply
What to do
Early stage – get on the client's or bidders' vendor lists now.