ADNOC new 4 Mtpa onshore LNG liquefaction facility – site visit for FEED-to-EPC contractors
منشأة أدنوك الجديدة لتسييل الغاز الطبيعي البرية بطاقة 4 ملايين طن سنوياً – زيارة موقع لمقاولي التصميم الهندسي والتنفيذ
LNG EPC contractors, cryogenic equipment and insulation suppliers should follow ADNOC's FEED-to-EPC competition for the new 4 Mtpa onshore liquefaction plant.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Abu Dhabi |
| Client / owner | ADNOC |
| Announced | 19 Oct 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- MEP & process design engineering (main package)
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- Industrial hot & cold insulation (main package)
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
- NDT, inspection & certification
- Pipes, valves & fittings supply
What to do
Early stage – get on the client's or bidders' vendor lists now.