AKASHI 100 MW carrier-neutral data centre campus (Tier IV design, phase 1 ~10 MW) – EDB USD 31.2M financing signed, total ~USD 354M
تأهيل مسبق – Kazakhstan
Data-centre MEP, cooling, UPS/generator and fibre contractors can approach AKASHI on its 100 MW Astana campus now that EDB has signed USD 31.2M of financing (phase 1 operations targeted 2027).
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Kazakhstan · Astana |
| Client / owner | AKASHI Data Center PLC |
| Value | USD 354M |
| Announced | 27 Oct 2026 |
| Project type | Data centres |
Trades and packages needed
- HVAC & ventilation (main package)
- Electrical installation (LV) (main package)
- Generators, UPS & standby power (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- MV/HV substations & transmission lines
- Fire protection & fire alarm
- BMS, controls & SCADA
- Concrete works (in-situ)
What to do
Early stage – get on the client's or bidders' vendor lists now.