Al-Ghubar field (Block 6) gas-oil gravity drainage facility – lowest bidder emerged in EPC tender
منشأة الصرف بالجاذبية للغاز والنفط في حقل الغبار (منطقة الامتياز 6) – ظهور أقل عطاء في مناقصة الهندسة والتوريد والإنشاء
Oil & gas fabrication, piping and E&I subcontractors should engage the bidders on PDO's Al-Ghubar GOGD facility ahead of award.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Oman · Qarn Alam |
| Client / owner | Petroleum Development Oman (PDO) |
| Announced | 01 Oct 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Pressure vessels, tanks & heat exchangers
- Pipeline construction
- NDT, inspection & certification
- Scaffolding & access
- Camps, temporary facilities & catering
- Pipes, valves & fittings supply
What to do
Early stage – get on the client's or bidders' vendor lists now.