Al Kamil I 500 MW solar PV plant – detailed engineering design & initial site studies
محطة الكامل 1 للطاقة الشمسية بقدرة 500 ميجاواط – التصميم الهندسي التفصيلي ودراسات الموقع الأولية
Topographic/geotechnical survey firms and PV electrical designers should approach IDOM; the USD 222M EPC by Shanxi will follow with mounting, cabling and substation packages.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Oman · Al Kamil Wal Wafi |
| Client / owner | Shanxi Installation Group (EPC contractor) |
| Awarded to | IDOM |
| Announced | 19 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- MEP & process design engineering (main package)
- Structural & civil design (main package)
- Land surveying & geotechnical investigation (main package)
- Solar PV & battery storage
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.