Al-Maktoum International Airport expansion – contractor selected for passenger terminal (airport: 5 runways, 2 terminals, 7 concourses, 430 gates)
توسعة مطار آل مكتوم الدولي – اختيار المقاول لمبنى الركاب (المطار: 5 مدارج، مبنيان، 7 أرصفة، 430 بوابة)
MEED reports Dubai has chosen the main contractor for the new Al-Maktoum terminal – steel, façade, MEP, baggage-adjacent systems and fit-out specialists should track the award announcement and pre-qualify early.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | UAE · Dubai (Dubai South) |
| Client / owner | Government of Dubai (Al-Maktoum airport expansion) |
| Awarded to | Not disclosed |
| Announced | 09 Oct 2026 |
| Project type | Airports |
Trades and packages needed
- Structural steel fabrication & erection (main package)
- Façades, curtain wall & cladding (main package)
- Concrete works (in-situ) (main package)
- HVAC & ventilation (main package)
- Electrical installation (LV) (main package)
- Fire protection & fire alarm
- ELV, ICT & security systems (CCTV, access, cabling)
- BMS, controls & SCADA
- Lifts, escalators & travelators
- Interior fit-out
- Aluminium, glass & glazing
- Piling & deep foundations
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.