2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Kuwait

Open tender

Al Mutlaa Residential City – management & supervision consultancy for public buildings in suburbs N1, N3, N4, N5, N6 (bid bond KD 50,000)

مدينة المطلاع السكنية – مناقصة استشارات إدارة وإشراف على تنفيذ المباني العامة في الضواحي N1 وN3 وN4 وN5 وN6

PAHW seeks a Kuwait-licensed engineering office (15+ years, 50+ staff, KD 75M of similar supervision) to supervise public buildings across five Al Mutlaa suburbs; bids close 24 Dec.

TypeOpen tender
StatusOpen – closes 24 Dec 2026 (35 days)
CountryKuwait · Al Mutlaa
Client / ownerPublic Authority for Housing Welfare (PAHW)
Announced15 Nov 2026
Deadline24 Dec 2026
Project typeSchools & universities, Mosques, museums & cultural, Offices & commercial buildings

Trades and packages needed

What to do

Register with the client and request the tender documents before the deadline.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIMozambiqueOpen – closes 18 Dec 2026 (29 days)

Climate vulnerability assessment along the Nacala Corridor and supervision of civil works (FIDIC Engineer), 45A000141/CP/05/2026 (World Bank EOI)

Client: Transport Corridors for Economic Resilience Mozambique SOP 2 Project (TRACER SOP2) – Ministry of Transport and Logistics

Pre-qualification / EOIColombiaCOP 20trnOpen – deadline not published

ANI concession pipeline for 2027 tendering – El Dorado Max airport expansion (COP 13trn, 45→73M pax), new Cartagena (Bayunca) airport (COP 6.13trn, 30-yr), Conexión Centro 5G road and Perimetral de la Sabana

Client: Agencia Nacional de Infraestructura (ANI) – private initiatives originated by Odinsa

Contract awardUnited StatesUSD 150M (ceiling, up to USD 300M with options)Contract awarded – subcontracting open

MWAA program management support task-order contracts (5 yrs + options) for Dulles USD 20bn+ redevelopment and Reagan National Terminal 1 replacement / South Area – planning, oversight, controls, construction management

Awarded to Jacobs Project Management Co.; TYLin International · Client: Metropolitan Washington Airports Authority (MWAA)

Pre-qualification / EOIArmeniaOpen – closes 15 Dec 2026 (26 days)

Feasibility study, designs, bidding documents and technical supervision for irrigation systems (Kotayk, Lori, Arzni-Shamiram, Lower Hrazdan incl. Ranchpar pumping stations & pressure pipelines, Debetavan), AM-WC-CS-03/1 (World Bank EOI)

Client: Armenia Water and Irrigation Services Enhancement Program – Phase 1 – Water Committee, Ministry of Territorial Administration and Infrastructure

Pre-qualification / EOITurkeyOpen – closes 07 Dec 2026 (18 days)

Mersin M2:3 rail system line (9.93 km, 11 tram stations, Ocak Kent Meydanı–Şehir Hastanesi–Meşot) – design review, construction supervision & consultancy, prequalification (İKN 2026/2207797)

Client: Mersin Metropolitan Municipality – Transportation Department

Want more leads like this?Get Project management & construction supervision, Quantity surveying & cost consultancy opportunities in your inbox every morning.
Get free alerts →