Al-Zour LNG import terminal – boil-off gas (BOG) reliquefaction unit EPC incl. commissioning & performance testing
محطة الزور لاستيراد الغاز الطبيعي المسال – أعمال الهندسة والتوريد والإنشاء لوحدة إعادة تسييل الغاز المتبخر
KIPIC has tendered an estimated USD 200M BOG reliquefaction EPC to 15 prequalified contractors, bids due 22 December – cryogenic equipment and insulation suppliers should line up with bidders.
| Type | Open tender |
|---|---|
| Status | Open – closes 22 Dec 2026 (79 days) |
| Country | Kuwait · Al-Zour |
| Client / owner | Kuwait Integrated Petroleum Industries Company (KIPIC) |
| Value | USD 200M |
| Announced | 01 Oct 2026 |
| Deadline | 22 Dec 2026 |
| Project type | Oil, gas & petrochemical plants |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Industrial hot & cold insulation (main package)
- Electrical & instrumentation (E&I) installation
- Pressure vessels, tanks & heat exchangers
- NDT, inspection & certification
- Scaffolding & access
What to do
Register with the client and request the tender documents before the deadline.