1667 live leads · 56 new today · updated 23 Oct 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Kuwait

Open tender

Al-Zour onshore gas processing plant for Dorra field (632 mmcf/d gas + 60,000 b/d condensate) – EPC tender, five contractors attend prospective-bidder meeting (USD 3.3bn)

محطة معالجة الغاز البرية في الزور لحقل الدرة (632 مليون قدم مكعب يومياً من الغاز و60 ألف برميل يومياً من المكثفات) – مناقصة هندسة وتوريد وإنشاء وحضور خمسة مقاولين اجتماع المناقصين (3.3 مليار دولار)

International EPC contractors and process, piping, rotating-equipment and E&I subcontractors should position for KGOC's Dorra gas plant at Al-Zour before the December 2026 bid deadline.

TypeOpen tender
StatusOpen – closes 29 Dec 2026 (67 days)
CountryKuwait · Al-Zour
Client / ownerKuwait Gulf Oil Company (KGOC)
ValueUSD 3.3bn
Announced22 Oct 2026
Deadline29 Dec 2026
Project typeOil, gas & petrochemical plants

Trades and packages needed

What to do

Register with the client and request the tender documents before the deadline.

Read the official source → Report a correction

Related live opportunities

Contract awardIraq · العراقContract awarded – subcontracting open

Two 125 MW combined-cycle units at South Baghdad gas power station and Khor al-Zubair – under construction by Dongfang Electric, service targeted before summer 2027

Awarded to Dongfang Electric · Client: Ministry of Electricity, Iraq

Pre-qualification / EOIEthiopiaOpen – deadline not published

Dangote Group – planned petroleum products pipeline and tank farms on the Djibouti–Addis Ababa corridor (plus proposed Zimbabwe–Zambia corridor) under USD 50bn 2026–2030 plan

Client: Dangote Group

Contract awardNorwayContract awarded – subcontracting open

Wisting oil field – FEED for FPSO topsides with option for engineering, procurement & project management (EPma)

Awarded to Aibel · Client: Equinor (operator; partners Aker BP, Petoro, INPEX Idemitsu Norge)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Southern Iraq seawater injection project Phase 2 (2.5M bpd) – MoU signed by ExxonMobil and Basra Oil Company

Client: Basra Oil Company

Contract awardUAE · الإماراتContract awarded – subcontracting open

Tadweer Group material recovery facility (200,000 t/yr MSW + 200,000 t/yr C&I waste) – groundbreaking, operations Q2 2028

Awarded to Urbaser (development partner) · Client: Tadweer Group

Want more leads like this?Get MEP & process design engineering, Process piping fabrication & welding opportunities in your inbox every morning.
Get free alerts →