Ameren Missouri 20-year resource plan – 10.6 GW gas (combined & simple cycle), 2.4 GW batteries, solar, wind, 1.2 GW nuclear
تأهيل مسبق – United States
Power EPCs and turbine-island contractors should track Ameren's plan, starting with 1.9 GW of simple-cycle gas by 2029 and 2.1 GW combined-cycle by 2031.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Missouri |
| Client / owner | Ameren Missouri |
| Announced | 30 Sep 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation
- Solar PV & battery storage
- Concrete works (in-situ)
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.