ANEEL Transmission Auction 4/2026, Lot 2 – 126 km of transmission circuits (Iaciara–Guarani de Goiás / Correntina) and new Iaciara 2 substation (300 MVA)
ترسية عقد – Brazil
Line and substation builders, tower and conductor suppliers in Goiás/Bahia should target EDP for the 48-month Lot 2 build after contract signing (expected Feb 2027).
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Brazil · Iaciara (GO) / Correntina (BA) |
| Client / owner | ANEEL (Agência Nacional de Energia Elétrica) |
| Awarded to | EDP Transmissão Goiás |
| Value | BRL 317M |
| Announced | 30 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Structural steel fabrication & erection
- Land surveying & geotechnical investigation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.