ANEEL Transmission Auction 4/2026, Lot 8 – three synchronous compensators (−200/+300 MVAr each) at Coletora Porto Velho substation for Rondônia and Acre voltage support
ترسية عقد – Brazil
Rotating-machine OEMs, heavy-haul logistics, foundation and E&I erection contractors should engage Celeo for the 42-month synchronous condenser installation in Porto Velho.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Brazil · Porto Velho (RO) |
| Client / owner | ANEEL (Agência Nacional de Energia Elétrica) |
| Awarded to | Celeo Redes Brasil |
| Value | BRL 753.2M |
| Announced | 30 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Mechanical erection & equipment installation (main package)
- Heavy lifting, rigging & transport (main package)
- Concrete works (in-situ)
- Electrical & instrumentation (E&I) installation
- Cables, switchgear & electrical materials
- HVAC, pumps & mechanical equipment supply
- Construction logistics, freight & customs
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.