ANEEL Transmission Auction 4/2026, Lots 1 & 7 – 238 km of new 230 kV lines in Bahia (Poções III–Itabuna III, Ibicoara–Brumado II C2) plus Coremas II 500/230 kV and Cajazeiras II 230/69 kV substations (2,100 MVA) and 113 km of lines in Paraíba
ترسية عقد – Brazil
Substation EPC contractors, transformer/switchgear and conductor suppliers, tower fabricators and line-stringing subcontractors should approach Neoenergia; contracts due Feb 2027 with 42–48-month build windows.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Brazil · Coremas / Cajazeiras (PB); Itabuna / Brumado (BA) |
| Client / owner | ANEEL (Agência Nacional de Energia Elétrica) |
| Awarded to | Neoenergia Transmissão |
| Value | BRL 1.16bn |
| Announced | 30 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Structural steel fabrication & erection
- Electrical & instrumentation (E&I) installation
- Land surveying & geotechnical investigation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.