APECO ecozone LNG-to-power project – MoU for 50–100 MW gas-fired plant with substation microgrid, LNG regas & storage, scaling to 500 MW then 2 GW (feasibility stage)
تأهيل مسبق – Philippines
Early-stage LNG power and microgrid plan in the Aurora ecozone – gas turbine/engine suppliers, LNG regas and substation EPCs can position during the feasibility phase.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Philippines · Casiguran, Aurora |
| Client / owner | Aurora Pacific Economic Zone and Freeport Authority (APECO) |
| Parties | ARQ Development Corp. / SC Megaworld Construction and Development Corp. / HML Technologies |
| Value | USD 150M |
| Announced | 30 Oct 2026 |
| Project type | Power plants & renewables, Oil, gas & petrochemical plants |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- MV/HV substations & transmission lines (main package)
- Process piping fabrication & welding
- Pressure vessels, tanks & heat exchangers
- Electrical & instrumentation (E&I) installation
- MEP & process design engineering
- Concrete works (in-situ)
What to do
Early stage – get on the client's or bidders' vendor lists now.