Argentina LNG trunk pipelines (~526 km) – line-pipe awards: Tenaris 24-inch liquids line (~100,000 t steel pipe); Grupo Cuñado (~200 km) and Corinth Pipeworks (~300 km) 48-inch gas line
ترسية عقد – Argentina
Pipe-coating, logistics/haulage and inspection firms should contact Tenaris, Cuñado and Corinth on the ~USD 2bn Argentina LNG line-pipe supply for the 526 km Vaca Muerta trunk lines.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Argentina · Neuquén – Río Negro (Sierra Grande) |
| Client / owner | YPF (Argentina LNG with Eni and XRG) |
| Awarded to | Tenaris; Grupo Cuñado; Corinth Pipeworks |
| Value | USD 2bn |
| Announced | 18 Nov 2026 |
| Project type | Pipelines & utility networks, Oil, gas & petrochemical plants |
Trades and packages needed
- Pipes, valves & fittings supply (main package)
- Steel, rebar & structural sections supply (main package)
- Construction logistics, freight & customs (main package)
- Industrial blasting, coating & painting
- Cathodic protection
- Heavy lifting, rigging & transport
- NDT, inspection & certification
- Pipeline construction
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.