Arroyo Duppy basin storm-drainage works stage 3 – channelling to Matanza River, storm collectors, secondary branches & culverts; LPI 1/2025 (IDB-funded) awarded (ARS 59.1bn)
ترسية عقد – Argentina
Precast culvert, dewatering, earthworks and ready-mix suppliers can offer packages to the Eleprint–Briales–TPS joint venture on this 720-day IDB-funded flood-control job in La Matanza.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Argentina · La Matanza, Buenos Aires |
| Client / owner | Province of Buenos Aires – Subsecretaría de Recursos Hídricos (IDB Programa de Drenaje y Control de Inundaciones) |
| Awarded to | UTE Eleprint S.A. – Briales S.A. – TPS Constructora S.A. |
| Value | ARS 59.1bn |
| Announced | 22 Oct 2026 |
| Project type | Wastewater & sewage, Pipelines & utility networks |
Trades and packages needed
- Storm-water drainage & culverts (main package)
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Precast & prestressed concrete
- Dewatering
- Rebar cutting, bending & fixing
- Ready-mix concrete, cement & aggregates
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.