1667 live leads · 56 new today · updated 23 Oct 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Argentina

Contract award

Arroyo Duppy basin storm-drainage works stage 3 – channelling to Matanza River, storm collectors, secondary branches & culverts; LPI 1/2025 (IDB-funded) awarded (ARS 59.1bn)

ترسية عقد – Argentina

Precast culvert, dewatering, earthworks and ready-mix suppliers can offer packages to the Eleprint–Briales–TPS joint venture on this 720-day IDB-funded flood-control job in La Matanza.

TypeContract award
StatusContract awarded – subcontracting open
CountryArgentina · La Matanza, Buenos Aires
Client / ownerProvince of Buenos Aires – Subsecretaría de Recursos Hídricos (IDB Programa de Drenaje y Control de Inundaciones)
Awarded toUTE Eleprint S.A. – Briales S.A. – TPS Constructora S.A.
ValueARS 59.1bn
Announced22 Oct 2026
Project typeWastewater & sewage, Pipelines & utility networks

Trades and packages needed

What to do

The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.

Read the official source → Report a correction

Related live opportunities

Open tenderArgentinaARS 21bnOpen – closes 26 Oct 2026 (3 days)

New San Martín de los Andes bus terminal on RP 48 (16 bays, 540 days, ARS 21bn) plus paving of Gingins & Torres callejones and two roundabouts on RN 40 – bid openings 26–27 Oct

Client: Province of Neuquén / Municipality of San Martín de los Andes

Open tenderSouth AfricaOpen – closes 29 Jan 2027 (98 days)

SANRAL N.002-010-2020/1R – improvement of National Route 2 Section 1, Swartklip (km 17.47) to east of Baden Powell Interchange (km 29.00), 48-month contract, CIDB 9CE

Client: South African National Roads Agency (SANRAL)

Open tenderBrazilBRL 72.5MOpen – closes 28 Jan 2027 (97 days)

Portão do Inferno tunnel on MT-251 – 170 m tunnel + accesses (513 m), integrated contract incl. basic & executive design (BRL 72.5M), new edital

Client: Governo de Mato Grosso – Sinfra-MT

Contract awardMalaysiaMYR 568.2MContract awarded – subcontracting open

TNB multi-voltage 500 kV–11 kV transmission & distribution substation at Paka – construction contract (MYR 568.2M)

Awarded to JTHSB-KPMSB-BSB JV (Jati Tinggi, Kerjaya Prospek, Betapac) · Client: Tenaga Nasional Bhd (TNB)

Pre-qualification / EOIKenyaKES 651bnOpen – deadline not published

Naivasha–Kisumu–Malaba SGR phases 2B/2C (369 km) – Treasury cost estimate raised to KES 651bn; ~KES 619bn external financing sought

Client: Government of Kenya – National Treasury / Kenya Railways

Want more leads like this?Get Storm-water drainage & culverts, Earthworks, excavation & site grading opportunities in your inbox every morning.
Get free alerts →