Badrashin 220 kV substation grid connection – electrical works, underground power & fibre-optic cables (6 months)
ربط محطة محولات البدرشين جهد 220 ك.ف بالشبكة القومية – أعمال كهربائية وكابلات أرضية وألياف ضوئية
EETC grid-connection award; HV cable, jointing and trenching subcontractors and fibre suppliers can approach the contractor.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Egypt · Badrashin (Giza) |
| Client / owner | Egyptian Electricity Transmission Company (EETC) |
| Awarded to | Egyptian Construction & Trade Company |
| Announced | 01 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Earthworks, excavation & site grading
- Water, sewer & utility networks (incl. HDD)
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.