Baranduda Electrical Energy Reserve 400 MW / 1.86 GWh BESS – CATL selected as battery supplier/technology partner
ترسية عقد – Australia
BOP electrical contractors and HV connection specialists in Victoria can target Birdwood Energy's 400 MW / 1.86 GWh Baranduda battery, now with CATL supply locked in and no EPC named yet.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Australia · Baranduda / Wodonga (Victoria) |
| Client / owner | Birdwood Energy / Aware Super (SEC Victoria minority stake) |
| Awarded to | CATL |
| Announced | 28 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.