Baru Marnda 1.5 GW hybrid – 1,000 MW wind (143 turbines) + 500 MW solar + BESS – development application lodged, FID 2027
تأهيل مسبق – Australia
Wind and solar EPCs, BOP civil contractors and HV suppliers should track this Pilbara giga-project ahead of a 2027 investment decision.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Karratha (Pilbara, WA) |
| Client / owner | Yindjibarndi Energy Corporation (YEC) with ACEN Renewables |
| Announced | 06 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Earthworks, excavation & site grading
- Concrete works (in-situ)
- Heavy lifting, rigging & transport
- Electrical installation (LV)
- Cables, switchgear & electrical materials
What to do
Early stage – get on the client's or bidders' vendor lists now.