Berwick Bank B 1.4 GW offshore wind – wind turbines and offshore substation platforms (with Smulders-HSM), Siemens Energy named preferred supplier
ترسية عقد – United Kingdom
Substation topside fabricators, HV equipment and E&I subcontractors: turbine and offshore substation scope for a 1.4 GW Scottish wind farm heading to FID in late 2027.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United Kingdom · Firth of Forth (offshore) |
| Client / owner | SSE Renewables |
| Awarded to | Siemens Energy (with Smulders-HSM for substations) |
| Announced | 11 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Offshore & modular fabrication yards (main package)
- MV/HV substations & transmission lines (main package)
- Structural steel fabrication & erection
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
- Industrial blasting, coating & painting
- NDT, inspection & certification
- Cables, switchgear & electrical materials
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.