Bilajari–Yalama railway upgrade – electrification, signalling & telecoms (ADB USD 350M, total USD 448M, completion 2030)
تأهيل مسبق – Azerbaijan
About USD 302M of ADB-backed works (electrification, signalling, telecom) on the Baku–Russian border line with an 18-month procurement plan – electrification EPCs should prequalify.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Azerbaijan · Baku |
| Client / owner | Azerbaijan Railways (ADY) CJSC |
| Value | USD 350M |
| Announced | 12 Oct 2026 |
| Project type | Rail & metro, Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Railway track & systems installation (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- Cables, switchgear & electrical materials (main package)
- BMS, controls & SCADA
- Project management & construction supervision
What to do
Early stage – get on the client's or bidders' vendor lists now.