Boardwalk Kosciusko Junction Pipeline Project – 103 mi 36-inch loop of Gulf South 42-inch line plus 8 mi Columbia Gulf Lateral, new Kosciusko (51,554 hp) & Holmes compressor stations, Isola expansion, 4 M&R stations (1.175 MMDth/d); FERC staff authorised construction 6 Nov 2026
تأهيل مسبق – United States
Pipeline spreads, compressor-station mechanical and E&I contractors, line-pipe, valve and coating suppliers: USD 1bn+ Mississippi gas loop now cleared to build, construction contracts not yet named.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Attala / Leake / Newton / Jasper / Clarke counties, Mississippi |
| Client / owner | Gulf South Pipeline Co. / Texas Gas Transmission (Boardwalk Pipelines) |
| Value | USD 1.11bn |
| Announced | 09 Nov 2026 |
| Project type | Pipelines & utility networks, Oil, gas & petrochemical plants |
Trades and packages needed
- Pipeline construction (main package)
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Earthworks, excavation & site grading
- Cathodic protection
- NDT, inspection & certification
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
- Pipes, valves & fittings supply
- Equipment & crane rental
What to do
Early stage – get on the client's or bidders' vendor lists now.