Bonny methanol & petrochemicals complex (500 ha) – USD 3.5bn MoU signed by Best Option Chemical and CNCEC
تأهيل مسبق – Nigeria
Process engineers, EPC contractors and piping/vessel fabricators can position early on a planned USD 3.5bn methanol plant in Bonny, with construction targeted within nine months and CNCEC financing 80%.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Nigeria · Bonny, Rivers State |
| Client / owner | Best Option Chemical Limited (Rivers State Investment Promotion Agency facilitating) |
| Value | USD 3.5bn |
| Announced | 16 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Factories & industrial plants |
Trades and packages needed
- MEP & process design engineering (main package)
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- Electrical & instrumentation (E&I) installation
- Piling & deep foundations
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Heavy lifting, rigging & transport
- Land surveying & geotechnical investigation
What to do
Early stage – get on the client's or bidders' vendor lists now.