BR-235 Tocantins River bridge (Ponte Prefeito Leôncio Miranda) – demolition and rebuild, integrated contracting (design and build)
مناقصة – Brazil
Bridge design-and-build contractors can bid for DNIT's BRL 430M BR-235 Tocantins River bridge before 22 January 2027.
| Type | Open tender |
|---|---|
| Status | Open – closes 22 Jan 2027 (88 days) |
| Country | Brazil · Pedro Afonso |
| Client / owner | DNIT |
| Value | BRL 430.4M |
| Announced | 23 Oct 2026 |
| Deadline | 22 Jan 2027 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Piling & deep foundations (main package)
- Precast & prestressed concrete (main package)
- Concrete works (in-situ) (main package)
- Demolition & dismantling (main package)
- Structural & civil design
- Marine works, dredging & reclamation
- Heavy lifting, rigging & transport
What to do
Register with the client and request the tender documents before the deadline.