BRT Bandung Basin Metropolitan Area (BBMA) phase 2 off-corridor – bus poles, medium/big shelters & end stations construction (ID-DGLT-574518-CW-RFB, World Bank)
مناقصة – Indonesia
Indonesian civil and steel-shelter contractors can bid the Bandung BRT phase-2 off-corridor stops and stations package by 6 Nov 2026 (bid security IDR 2.63bn, works Dec 2026–Jul 2027).
| Type | Open tender |
|---|---|
| Status | Open – closes 06 Nov 2026 (1 day) |
| Country | Indonesia · Bandung (West Java) |
| Client / owner | Indonesia Mass Transit Project – Ministry of Transportation |
| Announced | 28 Oct 2026 |
| Deadline | 06 Nov 2026 |
| Project type | Roads & highways |
Trades and packages needed
- Structural steel fabrication & erection (main package)
- Concrete works (in-situ) (main package)
- Roads, asphalt paving & road marking
- Roofing & sheeting
- Electrical installation (LV)
- Street, area & sports lighting
- Signage & wayfinding
What to do
Register with the client and request the tender documents before the deadline.