Bullawah Wind Farm (804 MW, 141 turbines) + 358 MW/718 MWh BESS – planning approval granted
تأهيل مسبق – Australia
Wind BOP, foundation, substation and battery EPC contractors should engage BayWa now that the 804 MW Bullawah project in the NSW South-West REZ is approved.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Hay, NSW |
| Client / owner | BayWa r.e. |
| Announced | 02 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Heavy lifting, rigging & transport (main package)
- Concrete works (in-situ) (main package)
- MV/HV substations & transmission lines (main package)
- Solar PV & battery storage
- Earthworks, excavation & site grading
- Roads, asphalt paving & road marking
- Equipment & crane rental
- Cables, switchgear & electrical materials
What to do
Early stage – get on the client's or bidders' vendor lists now.