Caspian–Black Sea–Europe Green Energy Corridor (Azerbaijan–Georgia subsea power link) – tender & FID preparation expected by end-2026
تأهيل مسبق – Azerbaijan
Mega transmission corridor heading into tender/FID preparation; HVDC EPCs, cable makers and owner's engineers should position early.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Azerbaijan |
| Client / owner | Government of Azerbaijan (Ministry of Energy) with Georgia partners |
| Announced | 28 Sep 2026 |
| Project type | Substations & transmission grids, Power plants & renewables |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Marine works, dredging & reclamation
- Land surveying & geotechnical investigation
- Structural & civil design
- Project management & construction supervision
What to do
Early stage – get on the client's or bidders' vendor lists now.