CFE Guadalajara 480.5 MW combined-cycle plant + 400 kV substation – turnkey EPC, Licitación CFE-0004-CACOT-0005-2026
مناقصة – Mexico
Bids for the lump-sum turnkey 480 MW CCGT (1,260-day build, 90% local labour) are due 12 Oct with award on 6 Nov; Mexican civil, mechanical and HV subcontractors should line up with the EPC bidders now.
| Type | Open tender |
|---|---|
| Status | Closed 12 Oct 2026 |
| Country | Mexico · Acatlán de Juárez, Jalisco |
| Client / owner | Comisión Federal de Electricidad (CFE) |
| Announced | 07 Oct 2026 |
| Deadline | 12 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Concrete works (in-situ) (main package)
- Structural steel fabrication & erection
- Heavy lifting, rigging & transport
- Industrial hot & cold insulation
- Earthworks, excavation & site grading
- Pipes, valves & fittings supply
- Cables, switchgear & electrical materials
What to do
Register with the client and request the tender documents before the deadline.