CFE 'Oasis' off-grid solar + BESS + green hydrogen plant – 72 MWdc/60 MWac PV, 20 MW/80 MWh batteries, 20 MW electrolysers, 4 x 1.5 MW fuel cells (proposals 18–30 Nov, award ~18 Dec)
مناقصة – Mexico
Solar EPCs, battery integrators and electrolyser/fuel-cell suppliers: CFE is taking proposals until 30 Nov for an off-grid PV, storage and hydrogen plant in Baja California Sur.
| Type | Open tender |
|---|---|
| Status | Open – closes 30 Nov 2026 (19 days) |
| Country | Mexico · Mulegé, Baja California Sur |
| Client / owner | Comisión Federal de Electricidad (CFE) |
| Announced | 07 Nov 2026 |
| Deadline | 30 Nov 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Mechanical erection & equipment installation
- Process piping fabrication & welding
- Pressure vessels, tanks & heat exchangers
- Cables, switchgear & electrical materials
- BMS, controls & SCADA
What to do
Register with the client and request the tender documents before the deadline.