CFE/Sener 'Mixtos II' renewables tender – 66 projects (57 solar 6,310 MW + 9 wind 1,931 MW, 8,241 MW) from 34 groups pass to Cenace interconnection studies
تأهيل مسبق – Mexico
Solar/wind EPC contractors, module and turbine suppliers and HV substation builders should engage the 34 shortlisted developers (GEMEX, AES, Invenergy, ICA, Cox, Solarig and others) before interconnection studies close.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Mexico · Nationwide |
| Client / owner | Secretaría de Energía (Sener) / Comisión Federal de Electricidad (CFE) |
| Announced | 16 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation
- Cables, switchgear & electrical materials
- Earthworks, excavation & site grading
- Heavy lifting, rigging & transport
- Mechanical erection & equipment installation
What to do
Early stage – get on the client's or bidders' vendor lists now.