Chandrapura 2×800 MW ultra-supercritical thermal power plant – main plant package (BTG, ESP, BoP civil/E&I), LNTP
ترسية عقد – India
Main-plant LNTP for a 1,600 MW thermal project – piping, mechanical erection, structural steel, E&I, civil and heavy-lift subcontractors should approach L&T before full NTP.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | India · Chandrapura, Jharkhand |
| Client / owner | DVC CIL Power Pvt Ltd (Damodar Valley Corporation – Coal India JV) |
| Awarded to | L&T Energy CarbonLite Solutions (Larsen & Toubro) |
| Announced | 07 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Heavy lifting, rigging & transport (main package)
- Structural steel fabrication & erection (main package)
- Concrete works (in-situ) (main package)
- Pressure vessels, tanks & heat exchangers
- Piling & deep foundations
- Industrial hot & cold insulation
- Refractory works
- Scaffolding & access
- NDT, inspection & certification
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.