2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Morocco

Open tender

Climate-resilience, hydrology, ESIA and feasibility studies for four irrigation schemes (Douirane, Aït Ziat, Tiddas, Dar Khrofa phase 3) – KfW-financed, 7 months

دراسات المرونة المناخية والهيدرولوجيا والأثر البيئي والجدوى لأربعة مشاريع ري (الدويران، آيت زيات، تيداس، دار خروفة المرحلة 3) بتمويل من KfW

Study tender for four KfW-backed irrigation schemes needing an eight-expert team – water-resources and ESIA consultancies should bid.

TypeOpen tender
StatusOpen – deadline not published
CountryMorocco · Chichaoua / Aït Ourir / Khémisset / Larache
Client / ownerMinistry of Agriculture (Morocco), KfW-financed
Announced02 Oct 2026
Project typeWater, desalination & treatment

Trades and packages needed

What to do

Register with the client and request the tender documents before the deadline.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIEthiopiaOpen – closes 02 Dec 2026 (13 days)

Feasibility study and detailed design for Weito pumped small-scale irrigation scheme (100 ha), Kolango-Zuriya Woreda, ET-SE-RPCU-571071-CS-QCBS (World Bank EOI)

Client: Lowlands Livelihood Resilience Project, Phase Two (LLRP II) – South Ethiopia Irrigation and Lowlands Development Bureau

Pre-qualification / EOIEthiopiaOpen – closes 02 Dec 2026 (13 days)

Feasibility study and detailed design of 4 gravel access roads (~97 km) and 3 bridges (~130 m), South Ethiopia Region, ET-SE-RPCU-571226-CS-QCBS (World Bank EOI)

Client: Lowlands Livelihood Resilience Project, Phase Two (LLRP II) – South Ethiopia Irrigation and Lowlands Development Bureau

Pre-qualification / EOIAngolaOpen – deadline not published

Greater PAJ cross-block ultra-deepwater development (1,500–2,000 m water depth) – geophysical/seabed survey completed by Fugro to support subsea infrastructure design and routing

Client: Azule Energy

Pre-qualification / EOIKenyaOpen – deadline not published

KenGen Marsabit wind farm – 200 MW first phase of planned 1,000 MW project, AFD-funded feasibility study (EUR 0.64M grant) under way

Client: Kenya Electricity Generating Company (KenGen)

Pre-qualification / EOIMorocco · المغربEUR 4.5bnOpen – deadline not published

Janassim e-fuels project – ~300,000 t/yr e-methanol and e-kerosene with 2.2 GW wind and solar, seawater desalination and electrolysis (EUR 4.5bn)

Client: MGH Energy Maroc / HOLSATEK

Want more leads like this?Get MEP & process design engineering, Land surveying & geotechnical investigation opportunities in your inbox every morning.
Get free alerts →