Concorrência Eletrônica 90004/2026 – supervision & inspection support for BRT Sul works, subsections 3 and 4 (DF-003/EPIA to Terminal Asa Sul), 900 days, est. BRL 8.61M
مناقصة – Brazil
Engineering supervision firms can bid by 23 December for this 900-day BRT works oversight contract, a sign that the BRT Sul construction packages are moving ahead.
| Type | Open tender |
|---|---|
| Status | Open – closes 23 Dec 2026 (48 days) |
| Country | Brazil · Brasília |
| Client / owner | DER-DF – Departamento de Estradas de Rodagem do Distrito Federal |
| Value | BRL 8.61M |
| Announced | 31 Oct 2026 |
| Deadline | 23 Dec 2026 |
| Project type | Roads & highways |
Trades and packages needed
- Project management & construction supervision (main package)
- Materials testing & QA/QC laboratory
- Quantity surveying & cost consultancy
What to do
Register with the client and request the tender documents before the deadline.