Construction of flood control structures in Bor South and Twic East counties – ~94 km earth-fill dykes + 4 retention ponds, 3 lots (RFB SS-MWRI-568546-CW-RFB)
مناقصة – South Sudan
World Bank-funded flood dyke works in three ~31 km lots; earthworks contractors with heavy-plant fleets and East African experience should bid.
| Type | Open tender |
|---|---|
| Status | Open – closes 27 Nov 2026 (36 days) |
| Country | South Sudan · Bor / Jonglei State |
| Client / owner | Regional Climate Resilience Program for Eastern and Southern Africa 1 (RCRP1) – Ministry of Water Resources and Irrigation (MWRI) |
| Announced | 15 Oct 2026 |
| Deadline | 27 Nov 2026 |
| Project type | Water, desalination & treatment |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Storm-water drainage & culverts (main package)
- Equipment & crane rental (main package)
- Land surveying & geotechnical investigation
- Materials testing & QA/QC laboratory
- Camps, temporary facilities & catering
What to do
Register with the client and request the tender documents before the deadline.