Copper World open-pit mine construction approved – 60,000 tpd concentrator (to 90,000 tpd), moly plant, tailings & in-pit crushing/conveying (USD 2.07B)
تأهيل مسبق – United States
Earthworks, concrete, steel erection and mechanical/electrical contractors should track EPCM and package awards for this newly sanctioned Arizona copper concentrator targeting first production in 2029.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Tucson (Pima County, AZ) |
| Client / owner | Copper World JV (Hudbay Minerals 70% / Mitsubishi Corp 30%) |
| Value | USD 2.07B |
| Announced | 23 Oct 2026 |
| Project type | Factories & industrial plants |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Structural steel fabrication & erection (main package)
- Mechanical erection & equipment installation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Process piping fabrication & welding
- MV/HV substations & transmission lines
- Heavy lifting, rigging & transport
- Equipment & crane rental
- Camps, temporary facilities & catering
- Pipes, valves & fittings supply
What to do
Early stage – get on the client's or bidders' vendor lists now.