2496 live leads · 53 new today · updated 10 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Brazil

Open tender

Corredor Ferroviário Minas-Rio concession (~733 km: Lot 1 Iguatema–Barra Mansa + Varginha–Lavras branch; Lot 2 Barra Mansa–Angra dos Reis) – auction 17 Dec 2026; winner to deliver recapacitation & modernisation plan within 2 years

مناقصة – Brazil

Rail operators, track-renewal contractors and rail-material suppliers: ~733 km freight corridor concession going to auction on 17 Dec with a mandatory rehabilitation plan.

TypeOpen tender
StatusOpen – closes 17 Dec 2026 (37 days)
CountryBrazil · Minas Gerais / Rio de Janeiro
Client / ownerANTT – Agência Nacional de Transportes Terrestres
Announced07 Nov 2026
Deadline17 Dec 2026
Project typeRail & metro

Trades and packages needed

What to do

Register with the client and request the tender documents before the deadline.

Read the official source → Report a correction

Related live opportunities

Contract awardCzechiaCZK 142.3MContract awarded – subcontracting open

Doudleby nad Orlicí station signalling repair and level crossings P4037/P4038 reconstruction, Týniště nad Orlicí–Letohrad line (single bid)

Awarded to AŽD Praha · Client: Správa železnic

Pre-qualification / EOIColombiaOpen – deadline not published

Bogotá Metro Line 2 – 15.5 km automated line, 11 stations (10 underground), 25 trains: three consortia prequalified in second tender (Mota-Engil/Spie Batignolles; Xi'an Rail Transportation Group; Sacyr/CAF), bids now requested

Client: Empresa Metro de Bogotá (EMB)

Pre-qualification / EOITurkeyTRY ~14bn (EIA cost estimates)Open – deadline not published

Erzincan–Erzurum–Kars high-speed railway (13 tunnels, 18 viaducts, 5 stations) – EIA approved, construction tender targeted for 2027

Client: Ministry of Transport & Infrastructure / TCDD

Pre-qualification / EOIDemocratic Republic of CongoUSD 125M (logistics programme)Open – deadline not published

ONATRA Matadi–Kenge rail freight corridor – rehabilitation of ~38 km line (rail replacement, bridge repairs, new structures) plus container terminals at Matadi port and Kenge dry port

Client: ONATRA (Office National des Transports)

Open tenderMexicoOpen – closes 06 Jan 2027 (57 days)

ATTRAPI LO-09-JZO-009JZO001-I-85-2026 – design & construction of Tramo IV subtramo San Luis Potosí Industrial Centro–Tangamanga, Querétaro–Saltillo passenger train: 32.7 km (km 194+500–227+243) with viaducts, stations, bridges, rail under/overpasses, footbridges; 973 days

Client: Agencia de Trenes y Transporte Público Integrado (ATTRAPI)

Want more leads like this?Get Railway track & systems installation, Earthworks, excavation & site grading opportunities in your inbox every morning.
Get free alerts →