Cox–Government of El Salvador USD 2.9bn water & energy programme – 440–500 MWh BESS, 200 MW solar (with CEL), LNG regas terminal + ~380 MW CCGT, water & sanitation works
تأهيل مسبق – El Salvador
Early-stage programme still subject to approvals: EPC contractors, BESS/solar suppliers and LNG terminal specialists should position with Cox for the upcoming project packages.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | El Salvador |
| Client / owner | Government of El Salvador; Comisión Ejecutiva Hidroeléctrica del Río Lempa (CEL) |
| Value | USD 2900M |
| Announced | 15 Oct 2026 |
| Project type | Power plants & renewables, Water, desalination & treatment |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Mechanical erection & equipment installation
- Process piping fabrication & welding
- Cables, switchgear & electrical materials
- Electrical & instrumentation (E&I) installation
- Water & wastewater treatment equipment
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.